Time-Dependent Path Scheduling (Record no. 174996)

MARC details
000 -LEADER
fixed length control field 03599nam a22005295i 4500
001 - CONTROL NUMBER
control field 978-3-658-28415-2
003 - CONTROL NUMBER IDENTIFIER
control field DE-He213
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240423125152.0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field cr nn 008mamaa
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 191122s2020 gw | s |||| 0|eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9783658284152
-- 978-3-658-28415-2
024 7# - OTHER STANDARD IDENTIFIER
Standard number or code 10.1007/978-3-658-28415-2
Source of number or code doi
050 #4 - LIBRARY OF CONGRESS CALL NUMBER
Classification number QA76.9.A43
072 #7 - SUBJECT CATEGORY CODE
Subject category code UMB
Source bicssc
072 #7 - SUBJECT CATEGORY CODE
Subject category code COM051300
Source bisacsh
072 #7 - SUBJECT CATEGORY CODE
Subject category code UMB
Source thema
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 518.1
Edition number 23
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Sedding, Helmut A.
Relator term author.
Relator code aut
-- http://id.loc.gov/vocabulary/relators/aut
245 10 - TITLE STATEMENT
Title Time-Dependent Path Scheduling
Medium [electronic resource] :
Remainder of title Algorithmic Minimization of Walking Time at the Moving Assembly Line /
Statement of responsibility, etc by Helmut A. Sedding.
250 ## - EDITION STATEMENT
Edition statement 1st ed. 2020.
264 #1 -
-- Wiesbaden :
-- Springer Fachmedien Wiesbaden :
-- Imprint: Springer Vieweg,
-- 2020.
300 ## - PHYSICAL DESCRIPTION
Extent XXIII, 169 p. 20 illus., 3 illus. in color.
Other physical details online resource.
336 ## -
-- text
-- txt
-- rdacontent
337 ## -
-- computer
-- c
-- rdamedia
338 ## -
-- online resource
-- cr
-- rdacarrier
347 ## -
-- text file
-- PDF
-- rda
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note Optimization Models for Minimizing Worker Walking Time Along Moving Assembly Lines -- Complexity Analyses, Combinatorial Properties, and Optimization Algorithms -- Numerical Experiments and Statistical Analyses.
520 ## - SUMMARY, ETC.
Summary, etc Moving assembly lines are the stepping stone for mass production of automobiles. Here, every second counts, which necessitates planners to meticulously optimize them. A crucial factor is each worker’s nonproductive walking time between the moving workpiece and line-side material containers for picking up required material. Minimizing the walking time is difficult because the workpiece moves steadily. Helmut A. Sedding devises algorithms to optimize the sequence of work operations, and the placement of material containers. Thereby, he introduces a novel category of time-dependent scheduling problems, and lays the basis for the algorithmic optimization of time-dependent paths at the moving assembly line. Contents Optimization Models for Minimizing Worker Walking Time Along Moving Assembly Lines Complexity Analyses, Combinatorial Properties, and Optimization Algorithms Numerical Experiments and Statistical Analyses Target Groups Scientists in computer science, mathematics, operations research, operations management, and industrial engineering Practitioners in the field of automobile production planning About the Author Helmut A. Sedding passed his doctoral thesis with distinction at the Institute of Theoretical Computer Science at Ulm University, Germany. He researches on modeling, complexity analysis, and algorithm design for the solution of various optimization problems. His practical experience includes the development of automotive production planning software in use at major car manufacturers.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Algorithms.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Operations research.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Management science.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Industrial engineering.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Production engineering.
650 14 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Algorithms.
650 24 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Operations Research, Management Science.
650 24 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Industrial and Production Engineering.
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element SpringerLink (Online service)
773 0# - HOST ITEM ENTRY
Title Springer Nature eBook
776 08 - ADDITIONAL PHYSICAL FORM ENTRY
Display text Printed edition:
International Standard Book Number 9783658284145
776 08 - ADDITIONAL PHYSICAL FORM ENTRY
Display text Printed edition:
International Standard Book Number 9783658284169
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="https://doi.org/10.1007/978-3-658-28415-2">https://doi.org/10.1007/978-3-658-28415-2</a>
912 ## -
-- ZDB-2-SCS
912 ## -
-- ZDB-2-SXCS
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type eBooks-CSE-Springer

No items available.

© 2024 IIIT-Delhi, library@iiitd.ac.in